Product Range · Zero-Capex OpEx Lease

BESS Products
125kW to 5MWh — India

From a 125 kW cabinet to a 5 MWh container — every unit designed, installed and managed by PWRNXT. Fixed quarterly lease. Zero upfront capital. Sub-10ms switching. 98.5% uptime SLA.

4
Product Variants
125kW
Starting Power
5MWh
Maximum Storage
₹0
Upfront Capex
LFP Chemistry <10ms Switchover 6,000+ Cycles IP55 Outdoor 98.5% Uptime SLA UL 9540A · IEC 62619 · CE Zero Capex · Fixed OpEx Lease

CHOOSE YOUR BESS UNIT.

Four configurations from a 125 kW indoor cabinet to a 5 MWh hi-cube container — every unit on a fixed quarterly OpEx lease with zero upfront capital and PWRNXT's contractual 98.5% uptime SLA.

PWRNXT PX-125 125kW 261kWh BESS Cabinet — indoor outdoor IP54 India
PX-125
125 kW
261 kWh usable
BESS Cabinet
Form factorIndoor / Outdoor Cabinet
CoolingLiquid Cooled
EnclosureIP54 Indoor-Rated
Footprint~2.4 × 0.9 m
Best for: EV fast-charging hubs · SME factories · Cold storage · Hospitals · Campuses
ENQUIRE →
PWRNXT PX-500 500kW 1045kWh BESS 10ft ISO container India
PX-500 Customisable
500 kW
1,045 kWh · configurable
10ft ISO Container
Form factor10ft ISO Container
CoolingLiquid Cooled
EnclosureIP55 Outdoor-Rated
Footprint3.0 × 2.4 m
Best for: Auto ancillary · Mid-size manufacturing · University campuses · Warehouses
ENQUIRE →
PWRNXT PX-2000 2MWh to 5MWh BESS 20ft ISO container India
PX-2000 / PX-5000 Customisable
2–5 MWh
Up to 5.5 MWh configurable
20ft ISO Container
Form factor20ft / 20ft Hi-Cube ISO
CoolingLiquid Cooled
EnclosureIP55+
Footprint6.0 × 2.4 m
Best for: Large C&I · Solar+BESS · Group captive · Industrial parks · Data centres
ENQUIRE →
PWRNXT clustered multi-MW BESS — 10MWh plus modular battery storage India
PX-CLUSTER
10+ MWh
Multi-unit · scalable
Modular Scale-Up
Config2–N containers
InterfaceCommon DC / AC Bus
EMSCentralised PWRNXT
Min. unitPX-2000 or PX-5000
IntegrationSolar, grid, DG hybrid
SizingSite-specific
Best for: Multi-MW solar · Renewable microgrids · EPC-led projects · SEZs
DISCUSS YOUR PROJECT →
Which unit is right for you?
Match your application or load size to the recommended PWRNXT unit.
By Application
DG replacement (critical backup)PX-125 / PX-500
Solar + BESS arbitrage (C&I)PX-2000 / PX-5000
Peak demand charge reductionPX-500 / PX-2000
EV fleet fast-charging hubPX-125 / PX-500
Open access / group captive solarPX-2000/5000 / Cluster
Multi-site portfolio rolloutPX-Cluster
By Load Size
Under 250 kWPX-125 Cabinet
250 kW – 1 MWPX-500 (10ft)
1 MW – 5 MWPX-2000/5000 (20ft)
Above 6 MWPX-Cluster
Not sure of load sizeRequest Sizing →

BUILT ON TIER-1 TECHNOLOGY

Every component is bankable, internationally certified, and chosen to outlast your lease. LFP chemistry, sub-10ms switching, aerosol fire suppression as standard across all variants.

Parameter PX-125
Cabinet
PX-500
10ft Container
PX-2000
20ft Container
PX-5000
20ft Hi-Cube
Battery Chemistry LFP LFP LFP LFP
Nominal Energy 261 kWh 1,045 kWh 2,000 kWh 5,000 kWh
Usable Energy (90% DoD) ~235 kWh ~940 kWh ~1,800 kWh ~4,500 kWh
Cycle Life 6,000+ cycles @ 80% DoD
Calendar Life Up to 15 years
Depth of Discharge Up to 90% usable (default 80% for longevity)
Battery Management Active cell balancing · SoC / SoH / SoP · Fault isolation · Full protection suite
Physical Footprint ~2.4 × 0.9 m 3.0 × 2.4 m 6.0 × 2.4 m 6.0 × 2.4 m (HC)
Parameter PX-125
Cabinet
PX-500
10ft Container
PX-2000
20ft Container
PX-5000
20ft Hi-Cube
AC Rated Power 125 kW 500 kW 1,000 kW 500 kW × N
AC Output Voltage 415 V ±10%, 3-phase — custom LT / HT on request
Round-Trip Efficiency ≥ 88%
Grid Performance
Switch-Over Time <10 ms — PLCs and CNC machines never detect an outage
Grid Modes Grid-tied · Islanding · Peak shaving · Time-of-Day arbitrage · Demand charge reduction
Solar Integration Optional Optional DC / AC DC & AC coupled DC & AC coupled
EMS & Monitoring
Energy Management PWRNXT proprietary EMS — optimises charge cycles against live tariffs in real time
Remote Monitoring 24/7 Remote Operations Centre · State-of-Health analytics · Automated anomaly alerts
Uptime Guarantee 98.5% contractual SLA — written into every lease
UL 9540A
IEC 62619
CE Certified
UN 38.3
MSDS Compliant
UL 1741
IEEE 1547
NFPA 855
PWRNXT BESS Safety and Compliance Architecture — UL 9540A IFC NFPA 855 IEEE 1547 UL 1741

Safety & Compliance Architecture

Each PWRNXT BESS deployment is engineered to meet rigorous international standards across every subsystem — from cell chemistry to grid interconnection — ensuring lender, insurer, and regulatory confidence.

Every unit ships with a full compliance dossier: cell-level certification (UL 9540A, IEC 62619), rack-level battery management (UL 9540A), PCS certification (UL 1741), fire and gas detection (IFC, NFPA 72), and complete installation signoff (NFPA 70, IEEE C2).

Cell: UL 9540A
Rack: UL 9540A
PCS: UL 1741
Fire: NFPA 855
Grid: IEEE 1547

We Build It. We Run It. We Guarantee It.

Not a broker. Not a reseller. A fully integrated engineering operator with contractual skin in the game.

🔧

Design & Engineering

Custom sizing and architecture for every site — chemistry, PCS, thermal management, grid interface.

🏭

Tier-1 Procurement

Tier-1 cell and inverter OEMs — CATL, BYD, Sungrow, Delta — with multi-year capacity warranties.

🧠

EMS Operations

Proprietary EMS optimises every charge cycle against live tariffs and battery health in real time.

🔩

Critical Spares

Pre-positioned critical spares at every site — so faults get fixed in hours, not days.

We Don't Just Monitor. We Guarantee.

Monitoring is table stakes. We write performance into the contract.

0%

Contractual Uptime SLA

Not a target. A contractual commitment — written into your lease, enforceable from day one.

<0hr

On-Site MTTR

On-site engineer response within 24 hours for critical faults. Critical spares pre-positioned at every site.

2–4wk

Predictive Failure Window

We flag degradation 2–4 weeks before it becomes a failure. Zero surprise downtime events.

24/7

Remote Operations Centre

Continuous State-of-Health analytics and automated anomaly alerts — across every PWRNXT asset in the field.

Insight Before Investment. Decision-Ready Analysis.

PWRNXT's structured assessment methodology converts your operational reality into a board-ready investment case — rigorous diagnostics, precise sizing, and the commercial numbers your leadership needs to act.

🔍
Operational Diagnostic
  • True diesel LCOE quantified per site — hidden costs surfaced and benchmarked against grid tariff
  • Outage archaeology: frequency, duration, and production-loss cost per event
  • Time-of-Day tariff mapping and demand-charge reduction opportunity scan
  • Facility risk classification by operational criticality and power-quality exposure
⚙️
Technical Engineering
  • Load-profile analysis and demand characterisation across operating shifts
  • BESS right-sizing: power (kW) and energy (kWh) matched to your actual load curve
  • Infrastructure assessment — grid interconnect, civil, and single-line review
  • Phased deployment sequencing to de-risk and stagger capital exposure
📈
Commercial Modelling
  • IRR, NPV and payback modelled against your actual DG and grid costs
  • Portfolio prioritisation: Tier 1/2/3 sites ranked by ROI, criticality, and ESG impact
  • Board-ready scenario analysis — sensitivity runs on diesel price, tariff, and policy
  • OpEx lease structure vs outright purchase — full TCO comparison
🏗️
Procurement & Tender Advisory Technical specification ranges, commercial framework design, and site clustering for multi-site procurement.
🌿
ESG & Regulatory Mapping Scope 1 emission reductions quantified, GRAP compliance positioning, and carbon disclosure readiness.
Request an Assessment →

Share your energy bills and DG logs. We scope and revert within 2 business days.

What you receive
📄
Feasibility Report Executive summary, site archetypes, economic screening and phased deployment roadmap.
📊
Portfolio Financial Model Cleaned KPIs, filterable dashboards, IRR/NPV/payback and savings charts across all sites.
🗂️
Site-wise Technical Annexures Per-site BESS sizing, load-curve analysis, cost comparison and priority tier.
📑
Board Presentation Decision-ready PPT — key findings, priority sites, strategic recommendations, and next steps.
🔒
Confidential by Default All data used solely for your assessment. Never shared. NDA available on request.

Tell Us About Your Site.

Our engineering team reviews every enquiry and responds within 2 business days with a unit recommendation and lease indicative.

Write to us.
contact@pwrnxt.in

Tell us your site's power requirement and location. We'll recommend the right BESS unit and provide a lease indicative within 2 business days.

🔒
Data Security Guaranteed Used only for sizing. Never shared. NDA available on request.
2-Day Response Sizing recommendation and lease indicative within 2 business days.
No Obligation Quote is free. Lease is your choice. No pressure, no follow-up spam.
🏆
98.5% Uptime SLA Written into every lease — contractual, not aspirational.
UL 9540A
IEC 62619
CE Certified
98.5% SLA

🔒  PWRNXT will never share or sell your data without your consent. Data is used solely to respond to this enquiry. Privacy Policy

🔒 Your data is secure. We will respond within 2 business days.

YOUR BESS. YOUR USE CASE.

Every PWRNXT product is built for a specific operating reality. Choose the application that matches your site.

PWRNXT BESS replacing diesel generator at industrial facility India
DG Replacement

Replace Your Diesel Generator

Diesel is costing you ₹25–30/kWh all-in. PWRNXT BESS delivers the same backup power for ₹7–8/kWh — with sub-10ms switching your PLCs never detect, zero NOx or PM2.5 emissions, and a contractual 98.5% uptime SLA replacing your current "no formal SLA" DG arrangement.

77%
Lower backup cost
<10ms
Switchover time
₹0
Upfront capex
98.5%
Uptime SLA
Read the Full DG Guide Cost breakdown · savings calculator · step-by-step replacement process
PWRNXT BESS integrated with rooftop solar at Maharashtra C&I facility
Solar + BESS · Maharashtra C&I

Solar ROI Recovery — Maharashtra

Free banking is over. Maharashtra's MERC policy means every unit exported earns ₹2.82 but every unit imported in the evening D-zone costs ₹14.31 — a ₹11.49/unit gap that destroys your solar ROI. PWRNXT BESS closes that gap by storing your solar generation and dispatching it precisely during peak hours.

₹11.49
/ unit gap closed
MERC
Policy aligned
₹0
Upfront capex
HT
Consumer ready
See Maharashtra C&I Application ₹11.49/unit arbitrage · MERC policy · Solar ROI calculator
Chat with us 💬