DG Replacement · BESS-as-a-Service · India

Ditch the Diesel.
Switch to Battery.

PWRNXT BESS delivers
UPS-grade Switching

Sub-10ms switching is invisible to PLCs and CNC machines — permanently eliminating the raw material waste that costs manufacturers up to 1% of annual turnover.

UPS-grade Switching
💸77% Cost Reduction
🌿Zero Emissions
🔕Near-Silent
📊Fixed Cost
✎ Quick Answer

Can You Replace a Diesel Generator with Battery Storage in India?

Yes. Replacing a diesel generator with a Battery Energy Storage System (BESS) in India saves 70–77% on backup energy costs, delivers sub-10ms switchover speed invisible to PLCs and CNC machines, and requires zero upfront capital under PWRNXT's operating lease model.

A diesel generator costs ₹25–30 per kWh of actual backup power once fuel inefficiency, delivery, and storage losses are counted. A BESS charges from the grid at off-peak tariffs of ₹7–8 per kWh — delivering the same output at a fraction of the cost.

Every diesel generator takes 10–30 seconds to reach stable voltage after a grid failure. During that gap, PLCs reset, CNC machines fault, cold rooms alarm, and in-process batches are lost. PWRNXT BESS switches in under 10 milliseconds — permanently eliminating the switchover gap.

PWRNXT deploys LFP BESS from 125 kW upwards across manufacturing, cold storage, hospitals, and commercial buildings throughout India — on a zero-capex operating lease with a contractual 98.5% uptime SLA and 24/7 remote monitoring.

<10ms
Grid-to-battery switchover — invisible to PLCs
70–77%
Reduction in backup energy cost vs diesel
₹0
Upfront capital — zero-capex operating lease
98.5%
Contractual uptime SLA with 24/7 monitoring

DG vs BESS Savings Calculator

Live
Your DG Setup
DG Capacity 500 kVA
Typical mid-size C&I facility: 250–750 kVA
Loading Factor 60%
% of rated kVA your DG actually runs during outages
Monthly Run Hours 40 hrs
~2 hrs/day × 20 working days = 40 hrs/month
Diesel Price (₹/litre)
Current market range: ₹88–102/litre
Grid Off-Peak Tariff ₹7.5/kWh
Delhi/NCR: ₹8–10 · Gujarat: ₹7–8 · Tamil Nadu: ₹9–11
Annual energy saving (DG cost − BESS charging)
saved per kWh
Annual DG Cost
—/kWh
VS
Annual BESS Energy Cost
—/kWh
Monthly lease self-funding check
Monthly energy saving
Monthly lease (equip + AMC incl.)
🔋
— kWh
BESS installed capacity
— kW
PCS power rating
📋
—/mo
Est. monthly lease
equipment + AMC incl.
Tonnes CO₂ avoided per year
Productive hours recovered per year
Litres of diesel eliminated per year
Monthly net position vs lease
Yrs 1–5 · Lease period
5-yr net
Yrs 6–10 · Post-lease
10-yr net
Net saving per year — ₹ Lakhs (after lease & BESS energy cost)
Lease period (Y1–5) Post-lease (Y6–10)
Get your site-specific PWRNXT quote
Your calculation is ready. Share your contact details and our team will send a detailed proposal based on these exact inputs — free, no commitment.
✓ Received! Our team will send your personalised BESS proposal within 24 hours.
⚠️ Submission failed — please try again or reach us on WhatsApp or +91 99717 73884.

What the Switch Looks Like On Your P&L

The numbers below use real-world inputs from a 500 kVA facility running 200 outage hours per year — typical for a mid-sized manufacturing plant or cold storage facility in North India.

The BESS quarterly lease is structured to sit at or below your current quarterly diesel spend. Most clients see positive net cash flow from month one — with operating margin improvement visible from the first quarterly close.

Share your DG capacity and monthly diesel consumption and we will return a personalised P&L within 24 hours.

Talk to Our Team →
💰 Annual Savings Illustration 500 kVA Facility
Current DG — Annual Operating Cost
Diesel fuel & logistics (480 hrs/yr @ ₹90/L)
DG maintenance, AMC & operator cost
Unrecovered production margin — switchover gap Hidden P&L leakage: batch losses, machine restarts & reject material from 10–30s DG spool-up
Total annual DG operating cost
PWRNXT BESS — Annual Operating Cost
BESS operating lease — equipment, installation & AMC
Incremental electricity — BESS off-peak charging Appears on your utility bill, not a separate contract
Maintenance, AMC & operator cost ₹0 — included in lease
Unrecovered production margin ₹0 — sub-10ms switching, zero gap
Total annual BESS operating cost
Gross Operating Margin Improvement
Annual reduction in power-related operating cost
🏆 10-yr cumulative: 🌿 CO₂ avoided: T/yr

What Your DG Really Costs You

Diesel fuel is only the start. The true all-in cost is 3–4× higher once every P&L line is counted.

Fuel: ₹25–30 per kWh

After accounting for thermal efficiency losses, delivery and on-site storage, diesel backup power costs ₹25–30 per kWh — versus ₹7–8/kWh for grid-charged BESS. You pay 3–4× more for every hour your DG runs.

₹25–30/kWh
vs ₹7–8/kWh for BESS
🔧

Maintenance & Staffing

Oil changes, injector servicing, load bank testing and AMC contracts add up to ₹200/kVA per year — a cost that rarely appears in the backup power budget but is a real recurring liability on every facility's P&L.

₹200/kVA/yr
DG maintenance + AMC + operator (capped ₹3L)
⏱️

The 10–30 Second Gap

Every DG takes 10–30 seconds to reach stable voltage after a grid trip. In that window, PLCs reset, CNC machines fault and cold rooms alarm. No diesel generator eliminates this switchover gap — BESS does.

₹3–8L
Typical cost per production outage event

Total All-In Backup Power Cost — 500 kVA Facility

Fuel + maintenance + operator + production loss from switchover delay, 200 outage hours/year

₹40–55Lper year

Every Reason to Make The Switch

Financial, operational, environmental, strategic — BESS replaces diesel across every dimension.

Sub-10ms Switchover

PWRNXT BESS transitions from grid to battery in under 10 milliseconds — invisible to PLCs, CNC controllers and server UPS systems. The 10–30 second DG spool-up gap that causes downstream production loss is permanently eliminated.

<10ms
Grid-to-battery switching time
💸

77% Energy Cost Reduction

BESS charges at off-peak grid tariffs (₹7–8/kWh) and dispatches during outages — replacing diesel at ₹25–30/kWh. A 500 kVA facility running 200 outage hours per year saves ₹18–25 lakh annually on energy alone.

77%
Backup energy cost reduction
🌿

Zero Local Emissions

No NOx, no PM2.5, no CO₂ at your facility. Removes emission compliance liability, eliminates diesel exhaust health risk, and delivers verifiable Scope 1 reductions for ESG and BRSR reporting from day one.

Zero
NOx, PM2.5 & CO₂ at facility
💰

Zero Capital Required

PWRNXT owns, installs and insures the asset. You pay a fixed quarterly operating lease — 100% tax-deductible as OpEx, off your balance sheet. No CapEx approval, no depreciation, no technology risk.

₹0
Upfront capital investment

Diesel Generator vs PWRNXT BESS

Every parameter your operations, finance, and sustainability teams care about — compared directly.

Parameter 🔴 Diesel Generator 🟢 PWRNXT BESS
Switchover Speed 10–30 seconds to operational voltage PLCs Reset <10ms — invisible to all control systems Zero Impact
Energy Cost ₹25–30/kWh all-in (fuel + losses + logistics) ₹7–8/kWh off-peak grid charging 77% Cheaper
Local Emissions NOx, PM2.5, CO₂ at point of use Compliance Liability Zero local emissions — 100% clean ESG Compliant
Noise Level >85 dBA continuous — noise compliance risk Restricted Zones ~75 dB near-silent solid-state operation No Restriction
Maintenance Oil, filters, coolant, injectors, load bank testing — ₹8–12L/yr Quarterly check by PWRNXT — zero internal workload Included in Lease
Fuel Supply Risk Diesel procurement, storage, price volatility, quality risk Operational Dependency No fuel — charges from grid at fixed tariff Zero Supply Risk
Capital Cost High upfront CapEx for new DG or refurbishment ₹0 — PWRNXT-owned on operating lease Off Balance Sheet
Uptime Guarantee No SLA — performance depends on operator and maintenance quality Contractual 98.5% uptime SLA with 24-hr MTTR Enforceable
Regulatory Trajectory Increasing emission norms, CPCB compliance burden Tightening Zero emission — future-proofed against all regulations Future-Proof

From DG to BESS — In Four Steps

Your existing DG stays live until BESS is commissioned and signed off. Zero gap in coverage at any point.

01

Feasibility Study

Our engineers audit your existing DG set, capture your load profile and historical outage data, and calculate the optimal BESS capacity to match or exceed your current backup coverage. Returned within 5 business days at zero cost.

02

Lease Agreement

We present a fully modelled financial case — BESS lease cost vs current DG cost, complete P&L impact, SLA terms and exit provisions. Standard lease term 5–7 years. Your finance and legal teams review before signing.

03

Parallel Installation & Testing

PWRNXT installs and commissions the BESS alongside your running DG — never in place of it. Full Site Acceptance Testing confirms sub-10ms switching and SLA compliance before your DG is reclassified as secondary or retired.

04

PWRNXT Takes Operations

From go-live, PWRNXT manages all BESS operations, monitoring and maintenance. Your DG operator's workload reduces significantly. Your quarterly invoice replaces your diesel fuel budget and AMC contract.

🛡️

Zero-risk transition guaranteed. Your existing diesel generator remains fully operational and available throughout the entire installation and testing period. We will not decommission your backup power coverage at any point. BESS goes live only after Site Acceptance Testing confirms every performance parameter has been met.

<10ms
Grid Switching Speed
LFP
Battery Chemistry
6,000+
Cycle Life at 80% DoD
98.5%
Contractual Uptime SLA
IP55
Outdoor Enclosure
24/7
Remote EMS Monitoring
UL 9540A
Fire Safety Certified
5 Year
Performance Warranty

DG Replacement FAQ

The questions operations heads and CFOs ask us most.

Can BESS completely replace my diesel generator?

For most C&I applications, yes. PWRNXT BESS sized to your load profile handles all routine outage events without any DG involvement. For sites requiring very long backup durations (over 4 hours), a hybrid BESS + DG configuration works best — BESS handles the sub-10ms switchover and short outages, while the DG remains available for extended grid failures. Both approaches eliminate the switchover gap entirely.

How much will I actually save by replacing my DG with BESS?

Most clients save 70–77% on backup energy costs. BESS charges at off-peak grid tariffs (₹7–8/kWh) vs diesel at ₹25–30/kWh all-in. For a 500 kVA facility running 200 outage hours per year, that is ₹18–25 lakh in energy savings before counting maintenance cost elimination and production loss recovery. Share your DG capacity and diesel spend and we will calculate your specific number within 24 hours.

How long does the transition from DG to BESS take?

From signed lease to commissioned BESS is typically 6–10 weeks depending on system size and site preparation. Critically, we install and test the BESS in parallel with your running DG — your backup power is never at risk during the transition. We do not decommission your DG until the BESS has passed full Site Acceptance Testing.

What happens to my existing DG set once BESS is installed?

You have two options. Most clients retain the DG as a secondary backup for extended outage events — which account for less than 5% of annual outage incidents for most facilities. Some clients decommission the DG entirely once the data confirms BESS covers all routine events, and recoup the ongoing maintenance and AMC contract cost. We recommend the hybrid approach for the first 12 months while you build confidence in the outage data.

Is there any capital required to move from DG to BESS?

Zero. PWRNXT purchases, finances, installs and insures the BESS asset — it sits entirely on our balance sheet. You pay a fixed quarterly operating lease that is 100% tax-deductible as OpEx. No CapEx approval, no depreciation, no asset management. For most clients, the quarterly lease is structured at or below their current quarterly diesel spend — making the cash flow impact neutral or positive from day one.

What certifications does PWRNXT BESS hold — is it safe for industrial use?

Our systems are built on Tier-1 OEM components from CATL, BYD, EVE Energy, Sungrow and Delta — certified to UL 9540A (fire safety for BESS), IEC 62619 (lithium battery safety for industrial use) and CE standards. We use LFP (Lithium Iron Phosphate) chemistry exclusively — the safest lithium chemistry available, with no thermal runaway risk. Our IP55 outdoor-rated enclosures require no special infrastructure in most Indian industrial parks.

Ready to Replace
Your Diesel Generator?

Commission a data-backed feasibility study. Our engineers calculate your all-in diesel cost, size the right BESS for your facility, and show you exactly what you save — month by month — within 5 business days.

Zero upfront capital
98.5% uptime SLA
5-day report turnaround
2-day scoping response
Commission Feasibility Study💬